GLOSSARY
Bidding glossary, in plain English
Written for the person who has been handed a tender question and a deadline, and is too far in to ask what SQ stands for.
01
Before you bid
The decisions and arrangements that exist before a tender lands on your desk.
-
Bid / no-bid
Whether to chase an opportunity at all. Often the highest-value decision in the process, and the one made with the least structure. More on this →
-
Framework agreement
An arrangement with one or more suppliers setting terms for future contracts. Being appointed to a framework is not winning work; it is permission to compete for it.
-
Call-off
An individual contract awarded under an existing framework.
-
Dynamic purchasing arrangements
Supplier lists that stay open for new entrants rather than closing after an initial round.
-
Prior information / pipeline notices
Advance publication of what a buyer intends to procure. Worth watching, and largely ignored by most suppliers.
02
The stages
What each stage is called, and what it is actually for.
-
PQQ
Pre-qualification questionnaire. The earlier stage where a buyer checks a supplier’s suitability before inviting a tender. Largely superseded; see SQ.
-
SQ
Selection questionnaire. The standard replacement for the PQQ in UK public procurement. Covers financial standing, insurance, health and safety and past performance rather than your proposal.
-
ITT
Invitation to tender. The main event: what the buyer wants, how they will assess it, and what you must submit.
-
RFP / RFQ
Request for proposal or for quotation. More common in private-sector and international procurement. An RFQ is usually price-led; an RFP asks for an approach.
-
Standstill
The pause between a buyer announcing an award and the contract being signed, during which the decision can be challenged.
03
How you are judged
The documents that decide the score. Read these before writing anything.
-
Award criteria
What the buyer will score and how much each part is worth. The single most-skipped document in the pack.
-
MEAT / MAT
Most economically advantageous tender, or most advantageous tender. The principle that an award weighs more than price alone.
-
Weighting
How the marks split between quality, price and the rest. A 70/30 quality split is a different bid from a 30/70, and should be written differently.
-
Scoring matrix
The buyer’s definition of what earns each mark. Where it is published, it is the marking scheme for an exam you are about to sit.
-
Assessment summary
The buyer’s account of how your submission was assessed. The most useful document you will receive, and the least read.
04
What they ask you to prove
The things evaluators look for evidence of, rather than claims about.
-
Social value
The wider economic, social and environmental benefit delivered alongside the work. Weighted meaningfully in most UK public procurement, and routinely asserted rather than evidenced, which is where marks go.
-
Win themes
The handful of things you want the evaluator to remember, carried through every answer rather than stated once.
-
Method statement
How you will actually do the work. Specific, sequenced, and tied to this project rather than to how you generally work.
-
Case study / project reference
Evidence you have done something comparable. Comparability is judged by the evaluator, not by you, which is why the choice matters as much as the writing.
-
Non-conformity
Where a submission fails a stated requirement. It can cost marks or remove the bid entirely. The expensive ones are those nobody notices before submission.
-
TUPE
The regulations governing what happens to employees when a service transfers between providers. Frequently material to price, rarely to the quality response.
05
Documents you will be sent
Three you will be given, in descending order of how often they are read.
-
Employer’s requirements
Also called the specification. What the buyer wants delivered, and the document your response is actually assessed against.
-
Contract particulars
The commercial and legal terms. Read by the commercial team, ignored by the bid team, and the source of most of the obligations you will be held to.
-
Schedules and appendices
Where requirements hide. A pack of several thousand pages will have its most consequential line somewhere in here.
06
A note on the words themselves
Bid, tender, proposal and submission are used interchangeably across the industry, and the distinctions people insist on are usually local rather than real.
If a document you have been sent uses a term differently from this page, the document wins. Every time.
07
If you have just been handed one of these
You are the person most of this industry’s material is not written for. Two pages that are: for engineers and estimators, and for bid writers and managers.
The blog carries what our teams see on live bids, no more than once a fortnight.
Start with one conversation
Bring a live bid, or a tender you have already submitted. Thirty minutes, no preparation needed.